Advanced 100MW Immersion Cooling System for Crypto Mining
This single-phase immersion liquid cooling equipment meets the requirements of 2000 kW (2MW) heat dissipation, power supply, and distribution network. Delivered in container form for rapid deployment, these data centers integrate power distribution, TANK systems, and network infrastructure into a highly stable operating environment.
Designed to withstand extreme weather conditions including rain, snow, hail, wind, salt spray, and high solar radiation.


| System Specifications | |
|---|---|
| Dimensions (W x D x H) | 12192mm x 2438mm x 2896mm |
| Gross Weight | Approx. 13,000kg (13 tons) |
| Miner Capacity | Customized |
| Input Voltage | 380V@50Hz / 415V@60Hz |
| Power Rating | 1.6 ~ 2MW |
| Heat Dissipation | Dry cooler / Cooling tower / Air cooling |
| Cooling Medium | S3X, S5X, BC888, etc. |
| Electrical Code | CE / UL |
| Working Temperature | -25 ~ 40ºC |
Project 1 (USA)
Project 2 (USA)
Solution A: Bitcoin Mining Farm
Cost-effective immersion optimized dry coolers ranging from 5kW to 921kW.

Solution B: Battery & UPS Storage
Ideal choice for precision air conditioning in data centers.

Solution C: Telecommunication Rooms
Custom wall-mounted air conditioning designs.

| Type (SHSL-D1) | Capacity (Water) | Water Flow (M3/h) | Fan Motor (W) | Sound (dB) | Weight (kg) |
|---|---|---|---|---|---|
| 005-1x350 | 4.89 KW | 0.85 | 140 | 31 | 38 |
| 009-1x450 | 9.39 KW | 1.63 | 540 | 43 | 55 |
| 014-1x500 | 14.32 KW | 2.50 | 830 | 49 | 75 |
| 020-1x500 | 19.80 KW | 3.50 | 830 | 49 | 91 |